2015
Hyundai Steel, Pohang, South Korea
Revamp of the drive system for UR and ED Main Drive
- Connection of the existing SIMADYN D main drives UR and ED to the new automation.
- Software engineering for the drives under SIMADYN D.
- Engineering, project planning, testing and commissioning.